Aquatic Complex: Construction Photos
Loading image. Please wait
Week one of construction. The light posts have been taken down.


10/6/09: Week one of construction. The light posts have been taken down.
10/6/09: Week one, not much happening yet.
10/13/09: Week two, all plants have been removed as well as the parking surface. The site is being prepared for the new aquatic addition.
10/13/09: Week two, big piles of dirt have been brought in to solidify the ground.
10/20/09: Week three, the site work continues. A large pump has been buried to remove ground water from the site.
10/20/09: Week three, more site work.
10/27/09: Week four, lots of digging. A few forms have been dug getting ready for concrete.
10/27/09: Week four, large footings for the mechanical areas have been poured. We are moving right along.
11/3/09: Week five, footings have been poured along the west side of the new facility.
11/3/09: Week five, the large footing for the mechanical area has been poured. Framework for the walls to the mechanical areas are going up.
11/10/09: Week six.
11/10/09: Week six.
11/17/09: Week seven, workers are preparing to remove the brick from the South wall of the facility.
11/17/09: Week seven, brick removal begins.
11/19/09: Week seven, a view of the construction from the Norco Building. All bricks have been removed.